AI Hub
AI情报
4 小时前
AI data center boom in Taiwan faces power, high-voltage line hurdles
信号 · AI
As AI data centers expand, Taiwan is facing challenges in securing power supply, battery backup, and cooling systems, with the state-run Taiwan Power Company (Taipower) requiring about two years to build dedicated 161 kV high-voltage lines.
发布于 2026-11-02 14:06
阅读原文